Street Overlays

The Street Maintenance Section enhances public safety through the preservation of our city streets. Maintenance is accomplished through pavement resurfacing, surface patching and crack sealing to prevent water infiltration and replacing deteriorated sections. Major resurfacing projects such as asphalt overlays are prioritized through a pavement Management System software program. The city has programmed to resurface the streets shown on the chart below.

Project

The City of Beaverton’s Public Works Department will be performing street maintenance inlays on June 26th & June 27th, pending weather. Maintenance inlays will be performed in varies locations on Brockman and adjoining streets to remove the pavement distresses.

SW Brockman St. (Murray Blvd. to Sorrento Rd.) – East Bound Lanes Only
SW 130th Ave. (Brockman St. to Madison Ct)
SW 135th Ave. (Brockman St. to Harness Ln.)

Work will begin at 9 a.m. and finish no later than 4 p.m. each day. Signals will remain on, traffic lanes will be flagged and remain open. The city will complete the project as quickly as possible and work to minimize inconvenience, but there will be occasional delays.

Street maintenance map SW Brockman

Resurfacing streets regularly, rather than allowing them to deteriorate, saves money for the city. Pavement resurfacing overlay is considerably less expensive than rebuilding streets. Beaverton inspects its streets frequently to determine which roads are in need of paving.

Project

Street Boundaries: SW Chelan Place

The City of Beaverton’s Public Works Department will be paving SW Chelan Place during the week of June 26th, pending weather.

The exact schedule is weather-dependent. Work will begin at 7 a.m., and finish no later than 5 p.m. each day. Traffic lanes will be flagged and remain open to local traffic. The city will complete the project as quickly as possible and work to minimize inconvenience, but there will be occasional delays. Watch for barricades that will indicate “No Parking” and will have the dates of when the resurfacing will occur.

Chelan Place overlay map

If you have any questions or concerns, please do not hesitate to call Debbie Martisak at 503-350-4084.

FY 2017 - 2018 STREET REHABILITATION PROGRAM

STREET NAME FROM STREET TO STREET
SW PONY PL EOP SW BROCKMAN ST
SW YEARLING CT EOP SW YEARLING PL
SW YEARLING PL SW YEARLING WAY EOP
SW YEARLING WAY SW MAVERICK TER SW PONY PL
Projected Start: 7/10 thru 7/14/2017    
     
SW BRIDLETRAIL AVE EOP SW BRIDLETRAIL AVE
SW POMMEL CT EOP SW BRIDLETRAIL AVE
SW STIRRUP CT EOP SW BRIDLETRAIL AVE
SW STIRRUP ST SW BRIDLETRAIL AVE SW STIRRUP ST
SW BRIDLETRAIL AVE SW DAVIES RD SW BROCKMAN ST
Projected Start: 7/10 thru 7/20/2017    
     
SW 133RD AVE SW DAVIES RD SW ANGORA LN
SW JUANITA PL EOP EOP
SW DAVIES RD SW SORRENTO RD SW 135TH AVE
Projected Start: 7/24 thru 7/28/2017    
     
SW JENNETT CT EOP SW SORRENTO RD
SW PACER CT SW PACER DR EOP
SW PACER DR SW STILLWELL LN SW SORRENTO RD
SW STILLWELL LN EOP SW SORRENTO RD
Projected Start: 7/24 thru 8/3/2017    
     
SW APPALOOSA PL SW NEW FOREST DR EOP
SW CAVALIER CT EOP SW NEW FOREST DR
SW DARTMOOR CT EOP SW NEW FOREST DR
SW NEW FOREST DR SW APPALOOSA PL SW NEW FOREST DR
SW PINTO CT EOP SW TRIGGER DR
SW PINTO TER SW PINTO CT SW NEW FOREST DR
SW TRIGGER CT EOP SW TRIGGER DR
SW TRIGGER DR SW 130TH AVE SW PINTO TER
Projected Start: 8/7 thru 8/10/2017    
     
SW WEIR RD SW DAVIES RD SW DAPPLEGREY LOOP
SW ARABIAN DR SW STALLION DR SW SADDLE DR
SW PALOMINO PL EOP SW STALLION DR
SW RODEO PL EOP SW WEIR RD
SW SADDLE DR SW PALOMINO PL SW WEIR RD
SW STALLION DR SW DAVIES RD SW BROCKMAN ST
Projected Start: 8/7 thru 8/23/2017