CIP 4118A - Settler Wy Waterline Replacement Ph 1

Project Description: Replace 5,594 feet of 6-inch pipe and associated structures in the Robinson and Greenway No. 5 subdivisions built in 1976 and 1977. Utility replacement in these subdivisions will require multiple phases.

Project Manager: Jim Brink, 503-526-2450

Project Status:

FY15/16: Conduct investigation to determine project scope and begin survey.

FY16/17: Complete survey, determine phasing, and complete design of Phase 1. 6-10-16: Completed base map by city staff. 12-14-16: Contract with CES to prvise base map for Greenway Ridge Townhomes. 12-16-16: 50% plans completed by city staff. Feb/Mar 2017: Potholing completed. 5-1-17: Greenway Ridge waterline replacement (CIP 4118) separated from CIP 4118A in order to ensure that Greenway Ridge was completed in the summer of 2017. 6-9-17: Design for CIP 4118 completed. 6-21-17: CIP 4118 advertised. 6-28-17: CIP 4118 mandatory prebid meeting held. Construction of CIP 4118 expected to be complete in the summer of 2017.

FY17/18: Design for CIP 4118A complete and project advertised on 9-20-17. Construction of CIP 4118A expected to begin in the fall of 2017 and be complete in the winter of 2018.

CIP 4118A Description

Residential neighborhood with waterline trench filled in with gravel.
Stacked black pipe for waterline projects.